More hiring tools

How Long Until Your New Hire Actually Produces?

Estimate weeks to first deal and full quota. See the revenue gap while they ramp. Every company is different — adjust the numbers to your motion.

21 weeks

to full productivity

$165,334 leak

Configure Scenario

$100,000
3 weeks
5 years
8

Higher number = longer cycle, slower early production.

Estimated Ramp Cost

$165,334

Revenue gap vs a fully productive rep over the ramp window

Weeks to first deal
13
Weeks to full productivity
21

Direct answer

This free calculator estimates weeks to first deal and weeks to full productivity for a new sales hire, plus the revenue gap during ramp. Pick a scenario (first-time in category, experienced new to product, or exact category match), then adjust monthly quota, onboarding weeks, years of experience, and demos-to-close. Pair it with the Territory Optimization Calculator and the Cost of a Bad Hire Calculator to see the full cost of slow starts and bad fits.

Updated Nov 2026, Chris Stinson. Chris is Managing Director of The Kas Group and has recruited sales and GTM talent since 2014.

The Ramp Gap

A new hire produces little or nothing during onboarding, then climbs. That gap against a fully ramped rep is pure quota you do not collect. On enterprise seats it compounds fast.

Hire for the motion

Matching prior experience to your product category and ACV shortens the curve more than generic sales skill. That is the difference between 3 months and 7.

How the numbers are calculated

The calculator uses only the inputs you set. Each line matches the live formulas in the tool. These are working assumptions, not a published ramp study.

  1. Scenario base. Three presets set starting effectiveness (20%, 35%, or 55%) and base ramp length (7, 5, or 3.5 months). The starting point does not move when you change the sliders. Only the scenario changes it.
  2. Adjustments. Each year of experience shortens the base ramp by 3%, and the shorten stops at 70% of the base. Eight demos to close is neutral. Each demo above or below 8 changes ramp length by 4%, and that adjustment stops at 80% of the base. Onboarding weeks are added on top, at zero production.
  3. Effectiveness curve. Onboarding weeks produce nothing. After that, effectiveness starts at the preset and follows an S-curve. It stays close to the start through the first stretch, climbs fastest about a third of the way through the ramp, then takes a long tail to reach 100% on the last ramp week. The curve is a logistic, normalized so the first ramp week equals the starting effectiveness and the last ramp week equals 100%.
  4. Ramp leak. Weekly full quota is monthly quota divided by 4.33. Each week books that amount times that week's effectiveness. The leak is the gap versus a rep at 100% for the same number of weeks. Salary, recruiting fees, and manager time are not included.
  5. Weeks to first deal. Onboarding weeks plus demos-to-close divided by 2.5 times starting effectiveness, with a floor of 2 weeks after onboarding. The 2.5 is a working activity rate, not a benchmark. This number is separate from the effectiveness curve.

For context, The Bridge Group's 2026 survey of 158 B2B companies puts average AE ramp to full productivity at 6.2 months. Your number will be shorter or longer depending on the match between the hire and your motion.

Worked example (default inputs)

Experienced rep new to your product, $100,000 monthly quota, 3 weeks onboarding, 5 years experience, 8 demos to close. This is an illustration, not a forecast for your team.

  • Starting effectiveness: 35%
  • Five years of experience shortens the 5 month base by 15%, to 4.25 months. Eight demos to close does not change the length.
  • Onboarding: 3 weeks at 0%
  • Weeks to first deal: 13
  • Weeks to full productivity: 21
  • Shape: about 37% the first week after onboarding, about 49% by week 7, about 83% by week 12, then a tail to 100% by week 21
  • Ramp leak: $165,000

Change any input and the live total updates immediately.

Frequently Asked Questions

How long does it take a new AE to ramp?

Industry benchmarks put average AE ramp around 6 months. This calculator lets you model your own motion: onboarding length, prior experience with the product category, and how many demos it typically takes to close. The default experienced-new-product scenario lands at 21 weeks.

What does this calculator count as ramp cost?

The difference between what a fully productive rep would have produced and what the new hire actually produces during onboarding plus the climb to full effectiveness. It uses only the inputs you set. It does not include recruiting fees or salary.

Why does product category experience matter so much?

Someone who has already sold the same type of offer to the same buyer starts higher and climbs faster than a generalist or someone from a different motion. The three presets reflect that. You can override every number.

How should I use the weeks-to-first-deal number?

It is an estimate of when the first closed deal is likely, based on onboarding plus your typical demos-to-close and the starting effectiveness of the scenario. Use it for pipeline planning and for setting realistic ramp quotas. It is separate from the effectiveness curve.

What if my ramp runs past four months?

On most AE seats that means the seat is leaking more quota than many bad-hire scenarios. Pair this with the Cost of a Bad Sales Hire and Territory Optimization calculators to see the full picture before you open the req.

Sources